| Drill casing
When using
a drill casing, soil is removed within the protection of a steel tube
and brought to the surface. During the concreting process the borehole
support is transferred from the temporary drill casing, which is gradually
withdrawn, to the concrete forming the pile shaft.
Installation
and extraction or temporary drill casing can be carried out by:
vibrating
oscillating
rotating
|