In English only

Rope grab

Since the shovels of the grab form a cone when closed, the capacity of the grab and its corresponding rate of excavation per lift is only about 1/3 of the pile diameter. In order to compensate for the small volume of excavation, high-speed winches were developed at an early stage.

The time required to return the grab into the borehole is also minimized by way of an ejection device attached to the drilling rig.



Copyright ©1998-2009 GRV AB Legal disclaimer