| Pre-driving
Pre-driving
is often used to penetrate hard fills or stiff soil layers located close
to the ground surface. The objective of this method is to drive a heavy
steel profile or joist section through the stiff soil layer in order to
preform a hole. Thereafter the pile is installed in a conventional method.
This method may result in extraction difficulties and possible overstraining
of the pile rig.
|