Installation process > Bored Cast-in-situ piles

1. Loosening of soil: Cutting & Scraping Ripping Percussion
         
2. Removal of soil: Intermittent transport Continuous transport  
   
  • Rope grab
  • Flush drilling
  •  
       
  • Rotary drill
  • Continuous auger
  •  
             
    3. Temporary support: Drill casing Drilling muds Soil
       
  • Vibrating
  • Water
  •  
       
  • Oscillating
  • Bentonite
  •  
       
  • Rotating
  • Polymer
  •  
             
    4. Enlarged base: Underreaming Grouting Plug expulsion
             
    5. Casting of pile: Concrete mix Casting of concrete Reinforcement