In English only
|
Start
|
Search
|
About
|
Topic: Geotechnical design and analysis
Subject: vibrofloatation
Author:
yinka adewuyi
2009-09-30
hi
my geotech engineer informed me that to design the grid and depth of sand columns he will require borehole tests. is this corect? i would have thought that cpt would have been more relevant.
please advise.
Reply to this posting
Return to subject 'Geotechnical design and analysis'
Copyright
©1998-2009
GRV AB
Legal disclaimer