In English only
|Start|Search|About| 
Topic: Geotechnical design and analysis
Subject: vibrofloatation
 
Author: yinka adewuyi 2009-09-30  
     
  hi

my geotech engineer informed me that to design the grid and depth of sand columns he will require borehole tests. is this corect? i would have thought that cpt would have been more relevant.
please advise.
 
   

 

back.gif (57 bytes) Return to subject 'Geotechnical design and analysis'

 


Copyright ©1998-2009 GRV AB Legal disclaimer