|
Author:
Chan
|
2006-05-16 |
|
| |
|
|
| |
Mr. Fellenius mentioned ¡§A wave equation analysis needs to be 'calibrated' to the hammer, pile, and soil at the site¡¨ in the topic ¡§PDA and Hiley¡¨. Would Mr. Fellenius elaborate on the procedure of ¡§calibration¡¨ please.
|
|
| |
|
|
Return
to subject 'Dynamic Pile Testing'
|
Follow-ups:
|