In English only
|Start|Search|About| 
Topic: Geotechnical design and analysis
Subject: Tunnel design
 
Author: Mani Farahi 2005-05-03  
     
  I have modeled a tunnel with Plaxis program.The output shear forces in the bottom of linning( at the end section next to the ground) are extremely large and unreliable.
1-Is it a problem with plaxis?
2- Hoe can we overcome this difficulty considering the fact the in real cases the linning(shtcrete) can bear the shear forces?
 
   

 

back.gif (57 bytes) Return to subject 'Geotechnical design and analysis'

 

Follow-ups:

» Keith Wong, 2005-05-04

Show all follow-ups

Copyright ©1998-2009 GRV AB Legal disclaimer