Subject: pile cap design
 
Author: arnel caalim 2005-04-15  
     
  greeting to each and evryone...

i would like to have a research regarding cost effectiveness of pile cap. i would like to consider the number of piles i have come up using the nonlinear method(randolph) and elastic method.

using the said two methods, i would come up of various number of piles needed and yet it may still be asfe or conservative design. what i am looking to right now would be its effect in the pile cap design.

any help are most welcome sirs so i could be able to finish my thesis. thank you very much in advance... God Bless...

hope to hear from you soon...

by the way i am ARNEL C. CAALIM, a civil engineer by profession currently taking up masteral degree in geotechnical engineering at the MAPUA INSTITUTE OF TECHNOLOGY here in manila, philippines
 
   

 

Follow-up:
  Author: saeid 2005-05-24  
     
  im working marine.
and im responsibel engineringwork.
 
     

Follow-up:
  Author: arnel caalim 2005-05-27  
     
  am so sorry sir but i dont get what you mean by saying uyou're into such field. thank you very much!  
     

back.gif (57 bytes) Return to subject 'Piling'

 