Author:
Zacheus Indrawan
|
2002-12-18 |
|
| |
|
|
| |
I need to estimate the settlement of 7 m by 14 m concrete footing supporting a Gas Insulated Switchgear (GIS) Plant due to vibration caused by installation of sheetpiles at 1.5 to 2 m from the footing edge. The footing is founded at 0.5 m depth on loose to medium dense sand (electric cone tip resistance between 4 to 5 MPa)about 5 m in thickness overlying medium dense to dense sand. The sheetpile will be installed using ICE vibratory hammer ICE-428.
I tried to use Prof Massarsch' Method outlined in a paper 'Settlements and damage caused by construction-induced vibrations'. Int Workshop Wave 2000, Bochum, 2000.
Can anybody or Prof Massarsch advise on how to calculate the 'number of equivalent cycles' for such a continuous vibratory hammer. I also have a problem on how to calculate the parameter 'f1' in the settlement formulae.
Many thanks.
Zacheus
|
|
| |
|
|
Follow-up:
| |
Author:
Andre Ciputra
|
2005-01-15 |
|
| |
|
|
| |
Hi, Mr Zacheus, merry Christmass and Happy New Year.
Apa kabar pa Zacheus, bagaimana kabar keluarga, sekarang ada dmana di Jakarta atau di Perth?
Sudah lama kita ngga ketemu, saya Andre Ciputra bekas mahasiswa bapak di UKI dan ambil skripsi dengan Daniel Indrawan, msih ingat pak?
Saya ketemu di Auckland dgn ibu Novita Parulian, dan Pa Barita,Pohan,di St Andrew Church... Bagaimana si Yopie dan Eddy, masih di Multi Ageostecon.. Ok gitu dulu Pak GBU all.
Regards, Andre ciputra andreciputra@hotmail.com +64 9 278 5727.
|
|
| |
|
|
Return
to subject 'Piling'
|
Follow-ups:
|